top of page

Street Repair


At a Board meeting in late 2017, the Board contracted J&J Enterprise to make repairs in 2018, as soon as the weather warmed up. On 3/9/18, J&J completed the slurry seal, patch work and striping in the complex. In order to extend the life span of the asphalt, the Board will be citing vehicles in disrepair (oil leak), and monitoring activity in the parking lot . Not only is oil stains an eyesore and an aesthetic problem, oil stains can damage the asphalt and concrete. We ask that vehicle owners take the preventative measures to ensure their vehicle is maintained.

Thank you all for your cooperation and keeping our streets maintained.

 
 
 

Comments


Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Search By Tags
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic

© 2025 by Assured Real Estate.

bottom of page